Paola Villoria Sáez, Ana de Guzmán Báez, Justo García Navarro, Mercedes del Río Merino - Redefining construction and demolition waste management systems: best practices on civil engineering works  (Vol IX, No 3)

Vilnius Gediminas Technical UniversityRiga Technical UniversityTallinn University of TechnologyBaltic Road Association

 

Abstracted in databases:
Thomson SCIE: Science Citation Index ExpandedTM (Web of Science), INSPEC, EBSCO, TRIS/TRIS Online, VINITI, CSA's ERD, CSA/ASCE (CSA's TRD), SCOPUS (Elsevier Database)

2015 Impact Factor: 0.519 ©2015 Thomson Reuters, 2015 Journal Citation Report®

ISSN 1822-427X print
ISSN 1822-4288 online
 

 

 
 

"The Baltic Journal of Road and Bridge Engineering"
Vilnius: Technika, 2014, Vol IX, No 3, p. 171-179


Paola Villoria Sáez, Ana de Guzmán Báez, Justo García Navarro, Mercedes del Río Merino

Redefining construction and demolition waste management systems: best practices on civil engineering works

DOI: 10.3846/bjrbe.2014.22
 
The civil engineering sector has to assume among its aims the reduction of the construction and demolition waste generated by it. To this end, foreseeing the amount of construction and demolition waste to be generated, as well as the time phase in which they might be produced, will allow for planning good environmental practices on site, both in a general way for all the waste as for each individual category of waste. The aim of this research paper is to determine the major categories of construction and demolition waste produced in railway construction works, and the construction stages where they are mainly generated. At the same time, a Best Practices Manual including a relation of best practices for on-site waste management is proposed and could be included in the Internal Quality System of the companies. Results of this study show that establishing and implementing a Best Practices Manual in engineering works for the phases of construction of tunnels, preliminary works and ground movement involves the management and minimization of almost 95% of the total waste generated. In addition, integrating the Report and Management Plan of construction and demolition waste together with the Best Practices Manual, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process.
 
Keywords: construction and demolition waste, waste

Read full article (restricted access)

view contents of entire journal number    |    switch abstract language to Lithuanian, Latvian or Estonian

 

 
 

 

© Vilnius Gediminas Technical University, 2006 - 2018   |   Web Design   

Hey.lt - Interneto reitingai, lankomumo statistika, lankytojų skaitliukai